Georgia Concrete
retaining walls.
Superior Buildings and Carports, Inc.
Call 770-943-2265
8 foot concrete walls installed on back side of garage slab.
300 Tons of structural fill dirt brought in to level out parking area.
90 days completion time.
Engineered walls, footings and slab.
Water lines and gas lines moved for parking area.
7 steps into front door before start,
with no level parking.
Customer now has 2 car garage parking with extra parking around back
side of garage and an easy in/ out circular driveway.
CARPORTS
/
GARAGES
/
BARNS-STEEL
/
STORAGE BUILDINGS /
SHEDS /
FABRIC COVERS
PRICING /
CONTACT US /
SITEMAP /
LINKS /
PRIVACY
TESTIMONIALS